Progress made on the frame for the front pivot assembly, however it is not finished yet. I need to weld up the orange assembly shown in the CAD drawing and finish welding joints. It was kind of a bear to line up everything so it won't bind up , but I think I've got it pretty good. It will use two 1.25" pivot pins with grease fittings. Don't laugh but I am currently working on this project in the back of a 16' box truck. With the doors open it is great to use for welding and grinding. This keeps the metal dust out of the garage not to mention I am space challenged in the garage.
No comments:
Post a Comment